Flow rate, stream source, available water analysis, current treatment setup, site location, and reuse or discharge target are enough to start a useful technical conversation.
Contact Indra Water.
Send a short request, or open a guided technical assessment when you have site and stream data ready.
What happens after your submission?
-
1
Discovery call
A focused call clarifies site realities before anyone promises cost or timelines.
-
2
Technical Fit
We check industry, flow, stream type, and whether ElectroX is a realistic fit.
-
3
Data review
The team reviews lab values, reuse target, constraints, and current plant setup.
-
4
Route and proposal
You get the recommended treatment route, integration logic, and next commercial step.
Questions before you submit.
Practical answers for project owners, consultants, and plant teams evaluating a reuse route.
Have the details ready? Start the assessment
Yes. The team can evaluate retrofit, pre-RO, polishing, or standalone roles depending on the stream chemistry, hydraulic load, and site constraints.
No. A lab report helps, but an initial call can begin with estimated flow, wastewater source, known pain points, and the intended reuse application.
OPEX depends on flow, pollutant load, target quality, existing system performance, chemical handling, power, downtime, and the value of water reuse at the site.
Timeline depends on site readiness, civil scope, electrical availability, integration with existing treatment, equipment sizing, and approval requirements.
Reuse depends on the incoming stream and target quality. Indra maps the treatment route around the specific application and applicable norms.